Fill out the form below and give us all your property details.
Use the resources below to start bringing Fioptics to your new, existing, or upgraded home, business, or commercial property.
Fill out the form below and give us all your property details.
Follow the steps to plan accordingly and be ready for construction.
Need more detail? See our spec sheets for all the answers.
Get answers to most of the common questions.
Phase | Developer Action | Hawaiian Telcom Action |
---|---|---|
Step 1 Initial Planning |
|
|
Step 2 Initial Drawings |
|
|
Step 3 Final Drawings |
|
|
Step 4 Bill of Materials |
|
|
Step 5 Demolition (optional) |
|
|
Step 6 Scheduling |
|
|
Step 7 Construction |
|
|
Step 8 Inspection |
|
|
Step 9 Move In |
|
|
If your site is a low rise, cabinets are all that is needed for FDT's. See Telecom Room, Cabinet, & Conduit Sizing
HT typically requests an 18”x24”x6” cabinet on each floor.
For low rises, a larger MDF cabinet on the first floor may replace the need for IDF cabinets on subsequent floors.
For high rises, larger cabinets or backboard space in a telecom/electrical room are also acceptable.
See Telecom Room, Cabinet, & Conduit Sizing
Cabinets are not needed if a room is provided. The room can be shared with CATV and Electric as well.
HT requests a 4'x8' backboard in MDF rooms and only 4'x4' backboards in IDF rooms/closets. The backboard should be 3/4" termite treated. See Telecom Room, Cabinet, & Conduit Sizing.